Solar construction
Solar construction, engineered for execution.
From mobilisation to handover, with quality control written into the programme rather than added at the end.
- Utility scale
- Working inside EPC structures
- Scope and interfaces up front
Execution flow
From mobilisation to handover
Four stages where responsibility is clear and the condition for moving on is written down.
-
Mobilisation
Work front taken over, facilities, people and plant in place. Scope split and interfaces confirmed in writing.
-
Execution
Work delivered to the construction design, with continuous front coordination and progress reporting.
-
Inspection
Hold points tied to stages. An element closes only once its check is confirmed, not once the package is finished.
-
Handover
Punch list closed, documentation compiled, scope handed over formally.
Scope
Execution stages
Every stage states three things: what we deliver, which interfaces we work across, and what we hand over.
-
Mechanical installation
Mounting structures and mechanical elements installed within design tolerances.
-
Module installation
Modules installed following the handling rules the manufacturer requires.
-
DC cabling
Direct-current side installed, labelled and ready for testing.
-
AC works and inverters
Installation works at alternating-current equipment.
-
MV support
Supporting works on medium-voltage cable routes.
-
Testing and commissioning support
Participation in testing within our own works, and acting on the results.
-
Remedial works and punch list
Closing out the scope: clearing observations and completing outstanding work.
Project evidence
Projects published on confirmed data only
No rounded capacities and no borrowed photography. A project card shows only the fields that have been confirmed.
See how we present projectsTechnical discipline
Quality as part of the programme
Control is not a separate stage at the end. It is the condition for closing out every element of scope.
-
Prepare
Scope split into stages, with hold points and documentation requirements agreed before the start.
-
Execute
Work to the design and to manufacturers’ instructions, with deviations recorded and agreed.
-
Inspect
Checks carried out while an element can still be corrected without dismantling it.
-
Document
Records produced alongside the work, ready at handover.
-
Hand over
Punch list closed and the scope formally passed on for the works that follow.
Why this works
Pace comes from preparation, not from rushing
On a PV site the programme usually slips not because of working speed but because of unclosed decisions: who owns an interface, what counts as a finished element, and where the documentation is.
- Interfaces
- Boundaries with other contractors described before mobilisation, not negotiated on site.
- Definition of done
- For every stage it is clear what has to be satisfied before it counts as closed.
- One register
- Observations, inspections and the punch list in one place, each with an owner.
- Reporting without chasing
- An agreed frequency and format for progress and risk reporting.
What actually slows a build
Four things that cost more time than the work itself
In our experience a programme rarely slips because work is going slowly. It slips on decisions nobody closed.
-
An interface with no owner
An item both sides assume belongs to the other. It surfaces only once it is blocking the next front.
-
A vague definition of "done"
A stage treated as closed with no record confirming it. It comes back at handover, when the correction costs many times more.
-
Inspection after covering
A check carried out once the element can no longer be corrected without dismantling. Formally there is a check; practically there is not.
-
Documentation after the fact
Records reconstructed from memory once the work is finished. Handover becomes an exercise in recalling site history rather than confirming a state.
All four can be removed before mobilisation. None of them needs more people on site — only decisions written down.